Hosseinpour Asli, K., Naghdi, R., Nikooy, M. (2015). Estimation of cost and the amount of production in construction of forest road by combining hydraulic excavator and bulldozer (Case study: Liashisera district, Guilan Province). , 23(2), 320-331. doi: 10.22092/ijfpr.2015.103016
Keivan Hosseinpour Asli; Ramin Naghdi; Mehrdad Nikooy. "Estimation of cost and the amount of production in construction of forest road by combining hydraulic excavator and bulldozer (Case study: Liashisera district, Guilan Province)". , 23, 2, 2015, 320-331. doi: 10.22092/ijfpr.2015.103016
Hosseinpour Asli, K., Naghdi, R., Nikooy, M. (2015). 'Estimation of cost and the amount of production in construction of forest road by combining hydraulic excavator and bulldozer (Case study: Liashisera district, Guilan Province)', , 23(2), pp. 320-331. doi: 10.22092/ijfpr.2015.103016
Hosseinpour Asli, K., Naghdi, R., Nikooy, M. Estimation of cost and the amount of production in construction of forest road by combining hydraulic excavator and bulldozer (Case study: Liashisera district, Guilan Province). , 2015; 23(2): 320-331. doi: 10.22092/ijfpr.2015.103016


counter
Journal management system. designed by sinaweb